Design-Bid-Build

The Design-Bid-Build delivery model requires owners to pursue an architectural design that does not involve the construction teams.

Our service delivery

Under this model, the design phase completes before the preconstruction phase begins, so there are no efficiencies associated with early design and construction team integration. Consequently, Design-Bid-Build projects miss opportunities integrated teams have to explore practical, cost-effective alternatives for design, building materials, construction methods, and constructability.

Kinetic conducts thorough design document reviews during the tender period and offers advice regarding potential budget issues and other risk factors. However, since the design precedes builder involvement, addressing issues must be through change orders.

How we help clients build better

img

Mitigating design risks proactively during the tender period

img

Capitalizing on an extensive proprietary subcontractor database to prequalify and source candidates

img

Providing transparent, up-to-date project status information, including costs, progress, risks, and risk mitigation contingencies

img

Responding to clients' needs with project solutions that exceed expectations

img

Applying Lean methods to add value by optimizing scheduling, resource utilization, and eliminating waste

img

Managing commissioning and operations handoff

img

Securing resources and preferential pricing through established regional relationships with suppliers and subcontractors

img

Integrating technology where appropriate to enhance design, constructability, monitoring, control, scheduling, quality, and reporting